Anzor Handrail Eyelet Installation Guide

Anzor Handrail Eyelet Installation Guide

Installation Instructions

  1. Tube must be a minimum of 16swg or 1.5mm
  2. The thread on the eyelet has a 6mm x 1mm pitch
  3. The drill size to use is 5mm. No larger.
  4. To tap the thread Use a 6mm x 1mm pitch spiral point or gun tap. The reason for using this type of tap is they push material ahead of the tap thus giving more material to tap into. These taps can be used with a drill.
  5. Eyelets must not be over tightened - just screwed down until they seat in the correct alignment.

Metal Eyelet Balustrade

Advantages

  • Chamfered entry and exit for the wire, greatly reducing the chance of chaffing.
  • There is an under cut beneath the seat, so that the thread does not stop correct seating.
  • No welding required.

In order to maintain the best finish from your eyelet, wire and handrail see the Anzor cleaning & maintenance guide

Learn Something New

To receive useful info and product updates add your details below

Anzor Wallchart

Wall Chart

Request a copy of our Engineering & Marine, or Construction Wall Chart.

Anzor Catalogues

Standard Catalogues

Click here to download a PDF of our Engineering Catalogue. This catalogue includes stainless fasteners and fittings, marine hardware and construction brackets.

Anzor Catalogues

Construction Catalogues

Click here dot download a PDF of our Construction Catalogue. This catalogue includes stainless/galvanized fasteners and fittings, and construction brackets.

You are subscribed to push notifications but they are not enabled in your browser.
Please either enable push notifications here or unsubscribe here.